Skip to content
- Asset Integrity Management System (AIMS) – Upstream Oil and Gas Industry (PHE), Mubadala Petroleum, PT. Vale (2021-2023), PT. Badak LNG (2023)
- Risk Based Inspection (RBI) – Oil and Gas Upstream Oil and Gas Industry (2009 – 2019) and Downstream (Refinery Plant) 2012-2013.
- Fitness for Services (FFS) Assessment – PT PGN (2010 – 2020)
- Engineering Critical Assessment (ECA) – PT. Meindo (2023)
- Finite Element Analysis (FEA) – Piping, Pipeline (2021 – 2022)
- Reliability, Availability and Maintainability (RAM) Study – PT. TGI (2022)
- Reliability Centred Maintenance (RCM) – PT. JOB-Tomori (2022 – 2023)
- Pipeline Integrity Management – PT. PGN (2010 – 2019)
- Pipeline Risk Assessment – PT. PGN, PT. TGI, PT Pertamina EP (2010 – 2023)
- Gas and Condensate Pipelines Corrosion Study – ENI (2023)
- Condensate Storage Tank Inspection and Engineering Assessment – PT. PAG (2022 -2023)
- Asset Integrity Management System (AIMS)
- Risk Based Inspection (RBI) –
- Fitness for Services (FFS) Assessment
- Structural Integrity Management System (SIMS)
- Engineering Critical Assessment (ECA)
- Finite Element Analysis (FEA)
- Forensic Engineering and Root Cause Analysis (RCA)
- Reliability, Availability and Maintainability (RAM) Study
- Reliability Centred Maintenance (RCM)
- Pipeline Integrity Management
- Safety Integrity Level (SIL) Verification
- Electrical Integrity Management
- Energy Audit and Management
Go to Top